HEADS AND SUB-HEADS.

COLONY

STATEMENT OF EXPENDITURE IN THE YEAR, UNDE

ORIGINAL ESTIMATE OF

EXPEX-

ACTUAL EXPENDITURE.

OVER THE ESTIMATE,

ONGKONG, 1907.

B.HEADS, AS COMPARED WITH THE ESTIMATES.

INDER THE ESTIMATE.

SUPPLEMENTARY ESTIMATE.

UNESTIMATED.

DITURE.

$

Brought forward,

5.784.040

PUBLIC WORKS, --- Continued,

C-PUBLIC WORKS, EXTRAORDINARY,—Continued.

Miscellaneous.

18 Permanent Marks for Traverse Survey Points in

New Territories,....

5,000

$

#.

C.

".

5.462.041 14

234229

104348

368418 62

58020 45

کی نیکی کریے پر توده

REMARKS EXPLANATORY OF INCREASE OR DECREASE.

35847

4,685 35-

20.874 86

*.goo-

100 -

Yvon

Much les progreco

reade with work then was

Aulice fated

Preliminary work occupied longer et an anticipated a pressure of ofther work expired delfey.

is obtaining towers. Precure of other work prevented dispatch of caquisition for irenegrof h istinct to maple it to be receiveipt before she close of the year Work

a

clove of thes

tort potpored by imobilection from dort mitt en the

Hacker estimated

al

19 Reinforced Concrete Piers at Green Island Gumpow- der Depot, New Harbour Office and Kowloon City,

22,000

4125

14

20 Blake Pier Shelter,

20,000

:

21 Resuming and filling in Fish Pond at Tai Po,

9,000

2.100.

22 Miscellaneous Works,

25,000

40,255 32

57255 32

23 Store Acconut,

100

Public Health and Buildings Ordinance, 1903,

21 Compensation,

20,000

7.808 60

18,191

40

Water Works,

25 Albany Filter Beds, Reconstruction and Extension, ...

30,000

39.995

14"

26 Kowloon Water Works, Gravitation Sebeme,...........

256,600

08

27 Tyram Tuk Seheme, First Section,

30,000

28 Tytam Tuk Scheme, Second Section,

200,000

20,000

138, 147 70.238 65

140

20.548 56

56.667

3.409

01

68

40 228 25

118,452 93

199,998 bo

29 Miscellaneous Water Works,

Insanitary Property Resumption Water Supply Paise

enige der

1.050

3848 31 4739 49

Resumption of Private Property for liftin Railway to Cantore survey to Rife Range at the Peak . 1& Sichine. Reconstruction of Retaining wall at beside Queen's College Latrines - Krinale How loon. Carston Railway

Hot water apparati - Invernment Hous

A

Fem bredit balances of stores se .

re

2.593

5.812,873

35,670 09

یه کشته شده یا نور کو

350

12.080 2.800

3.410

-

1050

مریم کے یوم توجه

2.3:30 -

45

3.000

Merestimated

-to-

Ender ostinalid

work ordered to stavol

CARA

More work under to her than

Awa-p

anticipated

26. 664 of the completion of a conchach it. Seeger for boying out the mis hun.

3.409

1050

65 works carried over

ތ

this

Final arrangeusito not conflated metel

1987

3.848 31 Considered expertjiest to defray spare of cost of a wall wit a view to

rendering recipe the prince fat conflict confering the water on pply to the Enti 1.73949 Beder work undertaken.

2.593 45 extra work under taken

Curried forward,

6,431,740

5,757,203 47

270.

261

16456 34 356.919 62

97.32839